Different steps of a working site

Digging the trench

Arable soil separated from other soil layers

When the working area is ready, the trench for the pipeline is dug out. Fluxys ensures that arable soil and other soil layers are stored separately on the working area.

 

Special techniques

In order to restore the sites to their original state as fully and efficiently as possible, Fluxys may use special techniques to lay the pipeline in specific environments. To lay pipelines in hilly regions for example, clay plugs and peripheral drainage systems are used to minimise disruption to the flow of underground water.

> Next: water table
> Back

Tips for using search operators

Use "quotation marks" to search for a series of words or a phrase in a specific order.

Boolean operators

You can find a group of words or a phrase by using the link words AND, OR and NOT:
known as Boolean operators, these words are used to combine terms in the search field.

  • AND: All the search terms must be included in the publication. Typing in Apple AND Pear will return publications containing both the word Apple and the word Pear.

     

  • OR :  At least one of the search terms must be included in the publication. Typing in Apple OR Pear will return publications containing either the word Apple or the word Pear or both.

     

  • NOT: The term preceded by NOT must not be included in the publication. Typing in Apple NOT Pear will return publications containing the word Apple but not the word Pear.